04-10-2026, 09:46 AM
Hi Guys
The bias supply will track mains and loading effects of the PT. The zener protects the caps when the bias-set network is not connected, which should only be the case during incremental testing. Normally the zener is 'off' .
Have fun
The bias supply will track mains and loading effects of the PT. The zener protects the caps when the bias-set network is not connected, which should only be the case during incremental testing. Normally the zener is 'off' .
Have fun


